Avoid Costly Delays: The 3-Step Pre-Installation Checklist for Expansion Joints
A 5mm misalignment can lead to a $10,000 engineering delay. In international piping procurement, the biggest loss isn't the product price—it’s the downtime caused by mismatching standards or improper storage. This bold guide shares B-NAI’s insider checklist to help project managers verify flange standards, pre-stretch limits, and storage protection before installation.